MONITORING DAN EVALUASI PROJECT PA FLOW PLTU KEBAN AGUNG PADA BIDANG BUSINESS DEVELOPMENT DI PT PLN NUSANTARA POWER SURABAYA

Authors

  • Kharisma Erwina Putrikuri Universitas Pembangunan Nasional Veteran Jawa Timur
  • Yuniardi Rusdianto Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya

DOI:

https://doi.org/10.65096/pmb.v3i2.1592

Abstract

This research aims to analyze the monitoring and evaluation of the PA Flow project at PLTU Keban Agung in the Business Development Division of PT PLN Nusantara Power Surabaya. Monitoring and evaluation in MRO units plays an important role in the context of electricity generation. Through case studies and data analysis, this research identifies areas of improvement and proposes corrective actions to improve the service quality of the MRO unit. The results provide in-depth insight into the importance of monitoring and evaluating the PA Flow PLTU Keban Agung project in the Business Development Generation Derivatives Sector at PT PLN Nusantara Power.

References

Evaluasi Program Pemberdayaan Masyarakat Miskin oleh Muhammadiyah di Daerah Istimewa Yogyakarta. (n.d.). 123dok. Retrieved January 11, 2024, from https://123dok.com/document/lq5gnrwy-evaluasi-program-pemberdayaan-masyarakat-miskin-muhammadiyah-istimewa-yogyakarta.html

Maintenance, Repair, and Overhaul (MRO) Explained. (n.d.). UpKeep. Retrieved December 31, 2023, from https://www.upkeep.com/learning/maintenance-repair-overhaul/

Michael, T. (2019). Manajemen Pengembangan Bisnis: (Pengembangan Empirik Pada “Tibo-Tibo” Perempuan Nelayan). R.A.De.Rozarie.

Pengaruh Edukasi dan Monitoring Evaluasi Berkala Terhadap Peningkatan Penilaian Indikator Kinerja Pelaksanaan Anggaran Pengelolaan APBN. Jurnal Economina. (2022, October 15). EJOURNAL STIE 45 MATARAM. Retrieved January 11, 2024, from https://doi.org/10.55681/economina.v1i2.75

PT PLN Nusantara power, (2019). New Business. Indonesia : PT PLN Nusantara Power

Published

12/25/2024

How to Cite

Erwina Putrikuri, K., & Rusdianto, Y. (2024). MONITORING DAN EVALUASI PROJECT PA FLOW PLTU KEBAN AGUNG PADA BIDANG BUSINESS DEVELOPMENT DI PT PLN NUSANTARA POWER SURABAYA. Jurnal Pijar, 3(2), 234–237. https://doi.org/10.65096/pmb.v3i2.1592